Relevant experience

Work delivered across Australia and the South Pacific.

A selection of civil, structural, environmental and compliance projects for regional councils, government authorities and private clients.

Cowbed Bridge replacement over Wullwye Creek, Berridale NSW
Project Management · Civil

Cowbed Bridge Replacement

Snowy Monaro Regional Council · 2025

Superintendent and Surveillance Officer for the replacement of an existing timber bridge with a new single lane concrete bridge, located over Wullwye Creek, Berridale NSW.

Design codes

  • AS/NZS 5100:2017 Bridge Design Series
  • SM1600 Traffic Loading for Bridges
  • TfNSW QA Spec B80 Concrete Work for Bridges

Key advantages

Systematic, timely project surveillance including contractor payment claim verification, documentation review, and detailed on-site quality control documentation throughout construction.

Hempcrete wall texture and timber frame detail, Benandarah NSW dwelling
Structural

Structural Design — Hempcrete Dwelling

Benandarah NSW · 2025

Engineered structural design for a sustainable single-storey hempcrete dwelling on a sloped site, coordinated with the client, architect, builder and council to ensure code-compliant delivery.

Design codes

  • AS1720 Timber Structures
  • AS2870 Residential Slabs & Footings
  • NCC Performance Solution — hempcrete wall system

Key advantages

A screw-pile and timber floor system was engineered to suit the sloped site, with close coordination across client, architect, builder and council keeping the sustainable build on track for approval.

Retention pond for onsite wastewater treatment site
Environmental

Environmental Design — Onsite Wastewater Treatment

Parks Victoria · 2025

Project Manager and Lead Design Engineer for onsite wastewater solutions across six remote sites, from field investigations through to ‘For Construction’ design documentation.

Scope

  • Field investigations across 6 remote sites
  • Multi-criteria options assessment
  • ‘For Construction’ design documentation

Key advantages

Combining project management with lead design across six remote sites, backed by a structured options assessment, delivered wastewater solutions matched to each site’s specific constraints.

Timber plywood framed kit home structural assembly
Compliance · Structural

Building Code Compliance — Fast Slow Kit Home

University of Newcastle & Mudtech · 2025

A novel structural ply-framed, hemp-clay infill wall system for a Class 1a dwelling, developed as a high-performance, prefabricated, DIY timber-framed kit home. We provided close stakeholder engagement throughout conceptual design, prototyping and material testing, working alongside the university and delivery team as the system evolved from concept to a compliant initial build ready for project start-up.

NCC performance requirements achieved

  • H1P1 Structural stability & resistance
  • H2P2 Weatherproofing
  • H2P3 Rising Damp
  • H3P1 Spread of fire
  • H4P1 Wet areas
  • H4P6 Sound Insulation

Key advantages

Hands-on engagement across design, prototyping and material testing kept the compliance pathway aligned with real-world construction methods, achieving a compliant initial build and a smooth path to project start-up.

Longitudinal and cross section structural drawing, Orton Street House, Ocean Grove
Structural

Structural Design — Multi-storey Residence

Ocean Grove VIC · 2024

Structural design for a complex three-storey residence with basement, pool and car stacker garage on a challenging sloped site.

Design codes

  • AS3600 Concrete Structures
  • AS4100 Steel Structures
  • AS2870 Residential Slabs & Footings

Key advantages

Temporary retaining systems were designed to enable safe basement excavation, and direct engagement with neighbouring stakeholders secured the approvals needed to proceed.

Soil and Water Control Plan for Wolumla Gravel Pit quarry expansion
Environmental · Civil

Environmental Design — Quarry Expansion

Wolumla Gravel Pit, NSW · 2024

Authored the key environmental documents for a proposed quarry expansion and led stakeholder engagement on scope adjustments.

Key documents

  • Operational Environmental Management Plan
  • Soil & Water Management Plan
  • Rehabilitation Plan
  • Blasting Plan

Key advantages

Coordinated stakeholder engagement across planners, engineers, council and Transport for NSW resolved scope adjustments and kept the approvals process on track.

Rammed earth partition wall construction, Bonbeach VIC
Compliance · Structural

NCC Performance Solution — Rammed Earth Partition Wall

Bonbeach VIC · 2024

Prepared a Performance Based Design Brief and Report to achieve compliance for stabilised rammed earth partition wall construction, via the NCC performance solution pathway.

NCC performance requirements addressed

  • Structural stability & resistance
  • Weatherproofing
  • Rising damp
  • Spread of fire
  • Wet areas
  • Sound insulation

Key advantages

The performance-based pathway allowed a non-DTS material — stabilised rammed earth — to be used with confidence for an internal partition wall.

Jones Creek Bridge replacement under construction
Project Management · Civil

Jones Creek Bridge Replacement

Snowy Monaro Regional Council · 2023

Supervision and site project engineer for construction of the new alignment of Bobeyan Road over Jones Creek.

Design codes

  • AS/NZS 5100:2017 Bridge Design Series
  • SM1600 Traffic Loading for Bridges
  • TfNSW QA Spec B80 Concrete Work for Bridges

Key advantages

Geotechnical report review informed structural recommendations; managed procurement for design and construction contracts while overseeing budget, timeline and quality assurance.

Rural road redesign parametric model in AutoCAD Civil 3D
Civil

Rural Road Design

Snowy Monaro Regional Council · 2021

Redesign and realignment of 13.7km of rural collector road.

Design codes

  • Austroads Design Guidelines

Key advantages

34% survey cost savings via aerial survey with no measurable loss of data quality. Fully parametric AutoCAD Civil 3D model gave end-to-end interoperability from survey data to deliverables.

Nimmitabel Showground Pavilion
Compliance

NCC Building Audit — Nimmitabel Pavilion

Snowy Monaro Regional Council · 2021

Building audit to inform the design of proposed alterations to the Nimmitabel Showground Pavilion, covering mandatory and non-mandatory compliance upgrades and site-wide further assessments.

Audit codes

  • Disability (Access to Premises) Standards 2010
  • NCC Sections C, D, F & G

Key advantages

Thorough investigation and recommendations enabled a risk-managed approach to compliance upgrades.

Tidal barrage weir civil design site
Civil

Weir Civil Design

Corangamite Catchment Management Authority · 2020

Redesign of a steel sheet pile tidal barrage weir using fibre reinforced plastic sheet piles.

Design codes

  • AS2159 Piled Footings Design & Installation
  • AS3600 Concrete Structures

Key advantages

Rapid redesign after an historic weir structure was found below bed level. Scrutiny of sub-contractor geotechnical data saved the head D&C contractor $0.5 million by avoiding overly conservative design.

Timber portal frame boat building workshop render
Structural

Timber Portal Frame Commercial Structure

Private client · 2020

Structural design of an architectural ply-box timber portal frame boat building workshop.

Design codes

  • AS1720 Timber Structures

Key advantages

BIM with finite element modelling and a custom design methodology achieved structural adequacy within project constraints, including mandated non-conventional materials and specific aesthetic criteria.

Geotechnical soil pit investigation
Civil · Geotechnical

Geotechnical Investigation — Rural Road

Snowy Monaro Regional Council · 2020

Geotechnical site investigation to inform rural road design, including DCP, CBR, particle size distribution, standard compaction and Atterberg limits testing at a NATA accredited laboratory.

Design codes

  • AS1289 series geotechnical test methods

Key advantages

Thorough soil parameter analysis achieved maximum reuse of material won onsite and minimum pavement depths, delivering significant cost savings along the road.

Onsite wastewater forensic investigation site visit
Environmental

Onsite Wastewater Forensic Investigation

Parks Victoria · 2019

State-wide forensic investigation at 15 locations for problematic onsite wastewater land application systems, with reports and replacement system designs to rectify treatment deficiencies.

Design codes

  • AS1547 Onsite Domestic Wastewater Management
  • EPA Victoria Code of Practice — On-Site Wastewater Management 2016

Key advantages

100% compliance achieved across all land application sites. A 20% scope increase was delivered within the original project timeframe through rapid rescheduling.

Underground petroleum storage system investigation
Environmental

Underground Storage Tank Investigation

Snowy Monaro Regional Council · 2019

Environmental site investigation and recommendations for a historic underground petroleum storage system found during civil construction.

Design codes

  • Protection of the Environment Operations (Underground Petroleum Storage Systems) Regulation 2019

Key advantages

Rapid response prevented significant project delay. A strong lab relationship secured a 3-day weekend test turnaround, letting works continue with minimal delay and cost.

Brogo Quarry geotechnical site investigation
Civil · Geotechnical

Geotechnical Investigation — Brogo Quarry

Brogo Quarry · 2019

Geotechnical site investigation to inform environmental and civil design for a hard rock and gravel quarry.

Design codes

  • Managing Urban Stormwater: Soils & Construction — Vol 2E, Mines & Quarries
  • AS1726 Geological Site Investigations

Key advantages

Combining site investigation with a parametric AutoCAD Civil 3D model achieved maximum extraction volume with minimal soil and water management infrastructure.

Cooma Multi-Function Centre
Compliance

NCC Building Audit — Cooma Multi-Function Centre

Snowy Monaro Regional Council · 2019

Building audit to inform rectification works required for the building upgrade, with recommendations prioritising mandatory and non-mandatory compliance upgrades.

Audit codes

  • NCC Vol.1 BP1.1 & 2 — Structural reliability
  • AS3000 Wiring Rules
  • NCC Sections C & D

Key advantages

A prioritised list of upgrades enabled informed spending, maximising the benefit of available rectification budget.

Steel condenser rack structural 3D model
Structural

Condenser Rack Design

IGA · 2017

Structural design of a steel condenser rack within an existing building for a proposed IGA supermarket.

Design codes

  • AS4100 Steel Structures
  • AS1657 Fixed Platforms, Walkways, Stairways & Ladders

Key advantages

Thorough site investigation and Revit-based BIM modelling delivered a frame that fit optimally within a size-restricted building and integrated seamlessly into the supermarket floor plan.

Have a project like one of these?

We’d be glad to talk through scope, codes and timing.